Real Estate & Construction · 6 min read · 2026-03-08

Construction Permits in Georgia: Requirements, Procedure and Practical Considerations

Architect and landowner reviewing construction plans
Owning land does not entitle you to build anything on it. The first question is which procedure applies to your project and which restrictions attach to the specific plot.

Permit or notification

Construction is governed by the Code on Spatial Planning, Architectural and Construction Activities and Government Resolution No. 255, amended repeatedly, for example by Resolutions No. 573 and No. 631 of 2021.

The requirement turns on the building's class, set out in the Resolution's annex, not on size or height alone: a class attaches to the whole building, and where several parameters apply, the highest class prevails.

Lower-class works may fall under a simplified or notice regime, while repairs, under the Resolution, require no permit.

What to check before you build

Start with ownership and cadastral data in the Public Registry (extract fees).

Then establish zoning, development parameters and special regimes: the Environmental Assessment Code (amended, for example, in 2023) and the Law on Cultural Heritage may require further decisions or consents, and the heritage portal is a starting point.

The Code also allows permit issuance to be suspended for up to 12 months while an urban plan is drafted. Tbilisi's rules do not automatically apply in other municipalities.

Procedure and timing

A permit is issued in stages: land-use conditions, project agreement, permit. Topographic and engineering-geological surveys are mandatory for Classes II-IV; there is no universal document list, since it depends on class, location and the works.

According to a Zugdidi municipal guide, review takes 10 or 20 working days at the first stage, 17 at the second and 5 at the third; design work and curing deficiencies sit outside those periods.

Permits are administrative acts subject to challenge under the General Administrative Code, so watch statutory time limits.

After the permit and main risks

Build strictly to the approved project and permit conditions; any deviations require formal approval.

The consequences of building without a permit depend on the violation, including stoppage of work, heavy administrative fines, or mandatory demolition.

Allocate responsibility, warranties, and deadlines clearly in contracts with contractors under the Civil Code.

Key Takeaway

Conducting a rigorous legal check before construction begins is far less costly than curing violations afterwards. See our civil law, business law and court representation services, or book a consultation.

Frequently Asked Questions

Frequently Asked Questions: Construction Permits in Georgia: Requirements, Procedure and Practical Considerations

When is a construction permit required?

It depends on the building class and type of works. New construction, reconstruction, and demolition are separate types, while ordinary repairs require no permit under the Resolution.

Who issues the construction permit?

For Classes I-IV, local self-government (municipal architecture service), and for Class V, the Technical and Construction Supervision Agency.

How long does it take to obtain a permit?

The process is staged: 10-20 working days for stage one, 17 days for stage two, and 5 days for stage three, excluding architectural design time and curing deficiencies.

What happens if you build without a permit?

Consequences include suspension of works, heavy administrative fines, and mandatory demolition of unlawful structures. Each case requires direct legal analysis.

Is commissioning the same as a building permit?

No, commissioning (acceptance into exploitation) confirms that the finished building matches the approved project and permit conditions.

Need Legal Representation?

Contact advocate Gia Abashidze for specialized legal advice.

Book Consultation
Legal Insights & Guidance

Related Articles

All Articles →
Challenging Administrative Acts — Deadlines & Practical Guide
[Administrative Law]

Challenging Administrative Acts — Deadlines & Practical Guide

Find out the timeframe for appealing administrative decisions in Georgia and what happens if you miss the deadline. Consulting an administrative lawyer.

Read Article →
Legal Risks of Real Estate Purchase Agreements
[Civil Law]

Legal Risks of Real Estate Purchase Agreements

What to check in the Public Registry before buying an apartment or land, and how to avoid mortgage or foreclosure risks. Legal advice on real estate transactions.

Read Article →
Detention and Defendant Rights in Georgia — What You Must Know
[Criminal Law]

Detention and Defendant Rights in Georgia — What You Must Know

What rights a detained individual holds in Georgia: the right to remain silent, demanding an advocate, and maximum custody time limits under the Criminal Procedure Code. Criminal defense consultation.

Read Article →
How to Prove a Sham or Disguised Contract in Georgia
[Legal Practice]

How to Prove a Sham or Disguised Contract in Georgia

A signed contract is not the final word. Learn how to prove a sham or disguised contract under Article 56 of the Civil Code of Georgia: burden of proof, deadlines, and registry risks.

Read Article →
Buying an Apartment Under Construction in Georgia: Legal Risks to Check Before Signing
[Legal Practice]

Buying an Apartment Under Construction in Georgia: Legal Risks to Check Before Signing

When buying off-plan in Georgia, the biggest risk is often not an unfinished building but one clause nobody questioned at signing. Confirm developer permit, land registry, and buyer liability.

Read Article →
Medical Negligence and Patient Rights in Georgia: Legal Protection and Compensation Guide
[Legal Practice]

Medical Negligence and Patient Rights in Georgia: Legal Protection and Compensation Guide

Medical negligence and malpractice in Georgia: how to obtain medical records, initiate independent forensic reviews, and recover pecuniary and non-pecuniary damages.

Read Article →